INDEPENDENT MODEL-CODE AND SOURCING REVIEW

NACHI references accepted for structured RFQ review.

NACHI inquiries are separated by pump or valve family, complete design code and installation evidence before dimensional or functional comparison.

Published coverage5 series-level entries
Decision basisComplete code + interfaces + application
Commercial statusPrice, stock and route confirmed per RFQ

PRODUCT COVERAGE

What can enter the review process

Piston, vane and gear pumpsSolenoid valvesModular and pressure valvesHydraulic units

CATEGORY ROUTES

Review NACHI references by product category

Start from the product category that matches the installed component, then submit the complete model code.

IDENTIFICATION HIERARCHY

How a NACHI reference moves from a name to a decision

Brand recognition is only the first routing step. The review narrows the inquiry from manufacturer name to product family, series, complete code and finally the installed interfaces and duty.

  1. Brand and aliasesNACHI, Nachi-Fujikoshi
  2. Product familySeparate the reference into the relevant valve, pump, motor or service-part group.
  3. Complete identifierPreserve every suffix, revision, material number and option character visible on the nameplate or document.
  4. Installed evidenceCompare interfaces, operating conditions and application before any replacement statement is released.

SERIES DIRECTORY

Commonly submitted NACHI references

The table is an inquiry-routing index, not a compatibility chart. Every suffix and installed interface remains subject to review.

Series referenceProduct typePrimary review focusRFQ route
PVS / PZS / PZPiston pumpsDisplacement, control, pressure and mountingSend full code
VDS / VDR / VDCVane pumpsPressure setting, design series and mountingSend full code
IPHInternal gear pumpsPump size, section count and shaftSend full code
G01 / G03 / G04Modular valvesFunction, stack size and mountingSend full code
SA / SS / SLSolenoid valvesSpool, voltage, connector and sizeSend full code

FAILURE-MODE REVIEW

Why the series rows need different evidence

These checks explain the decision risk behind each published reference. They are review rules, not a claim that every listed configuration is available.

ReferenceMismatch riskEvidence needed for release
PVS / PZS / PZRotation, control, shaft, flange or port differences can prevent installation or damage the system.Code breakdown, displacement/control data and dimensional interface comparison.
VDS / VDR / VDCRotation, control, shaft, flange or port differences can prevent installation or damage the system.Code breakdown, displacement/control data and dimensional interface comparison.
IPHRotation, control, shaft, flange or port differences can prevent installation or damage the system.Code breakdown, displacement/control data and dimensional interface comparison.
G01 / G03 / G04The valve may mount but produce the wrong function, response or electrical behavior.Code breakdown, hydraulic function, interface drawing and electrical data.
SA / SS / SLThe valve may mount but produce the wrong function, response or electrical behavior.Code breakdown, hydraulic function, interface drawing and electrical data.

REQUIRED EVIDENCE

Prepare before quotation

  1. Complete model and design code
  2. Nameplate and installation photos
  3. Pump adjustment or valve function
  4. Electrical data where applicable
  5. Operating pressure and fluid

APPLICATION ROUTING

Common inquiry environments

  • Machine tools
  • Industrial machinery
  • Compact power units
  • Factory maintenance

Submit a NACHI reference for review.: Send the complete code, nameplate, quantity, destination and application. We separate confirmed facts, open points and conditional compatibility in the response.

WhatsAppRequest a Match